13 |
SIP- 11/2024-25 |
Supply, installation, commissioning and testing of 3phase, 500KVA Diesel Generator set in place of old 500KVA DG set with buyback & Supply and fixing of genset controller suitable to the existing in synch control panel for load sharing at Data center, Corporate office, APSPDCL, Tirupati
S |
29-10-2024 |
20-11-2024 |
CGM/Projects & IT |
Click Here |
12 |
SPMPT NO. 48 / 2024-25 |
11KV 200A TILTING TYPE AB SWITCHES WITH SOLID CORE POLYMER TYPE INSULATORS |
26-10-2024 |
08-11-2024 |
Purchase -4 |
Click Here |
11 |
SPWT NO. 29 / 2024-25 |
Construction of Ramasamudram Section Office building at 33/11KVSS, Ramasamudram in Operation Division, Madanapalli of Tirupati Circle |
29-10-2024 |
13-11-2024 |
CGM/P&MM & CIVIL/TPT |
Click Here |
10 |
SPWT NO. 30 / 2024-25 |
Construction of Rudravaram Section Office building at 33/11 KVSS, Rudravaram in Nandyal Division of Operation Circle, Kurnool |
30-10-2024 |
14-11-2024 |
CGM/P&MM & CIVIL/TPT |
Click Here |
9 |
SPWT NO. 31 / 2024-25 |
Construction of Section Office cum Control room and Bill collection centre building at 33/11 KVSS, Bathalapalli in Operation Town Division, Ananthapuramu of Ananthapuramu Circle. |
30-10-2024 |
14-11-2024 |
CGM/P&MM & CIVIL/TPT |
Click Here |
8 |
SPWT NO. 28 / 2024-25 |
Construction of office building for accommodating Sub-Division office, Section Office and Sub ERO at Nagalapuram in Operation Division, Puttur of Tirupati Circle |
29-10-2024 |
13-11-2024 |
CGM/P&MM & CIVIL/TPT |
Click Here |
7 |
SPMPT- 45/2024-25 |
M.S. FLAT 50x6mm, M.S. FLAT 75x8mm |
28-10-2024 |
12-11-2024 |
Purchase -2 |
Click Here |
6 |
SPMPT- 44/2024-25 |
M.S. Channel 100X50mm |
26-10-2024 |
11-11-2024 |
Purchase -2 |
Click Here |
5 |
SPMPT- 43/2024-25 |
M.S. Angle 65x65x6mm, M.S. Angle 50x50x6mm |
24-10-2024 |
08-11-2024 |
Purchase -2 |
Click Here |
4 |
SPMPT- 42/2024-25 |
G.I. STAY WIRE 7/3.15MM (10SWG), G.I.STAY WIRE 7/2.50MM (12SWG) |
22-10-2024 |
06-11-2024 |
Purchase -2 |
Click Here |
3 |
SPMPT- 41/2024-25 |
G.I. Wire 4.0mm (No.8SWG) |
19-10-2024 |
04-11-2024 |
Purchase -2 |
Click Here |
2 |
SPMPT- 40/2024-25 |
D.P. SET FOR H.T SERVICE |
18-10-2024 |
02-11-2024 |
Purchase -2 |
Click Here |
1 |
SPMPT- 1/2024-25 |
LT 3-PHASE 4-WIRE CROSS ARM WITH CLAMP FOR 8.0MTRS PSCC POLE & LT 3-PHASE 5-WIRE CROSS ARM WITH CLAMP FOR 9.1MTRS PSCC POLE |
16-10-2024 |
01-11-2024 |
Purchase -2 |
Click Here |