# Section Number of Complaints Min Duration(Days) Max Duration(Days) Average Duration(Days) Complaints Resolved(%)
1 AVALKONDA 2 1.73 2.56 2.14 100.00
2 PALASAMUDRAM 3 0.9 1.73 1.24 100.00
3 PENUMUR 1 0.2 0.2 0.2 100.00
Total 6 0.2 2.56 1.37 100.00