Rectification of Voltage fluctuations in APSPDCL where upgradation of distribution system was required October-2022 To December-2022
# Division Number of Complaints Min Duration(Days) Max Duration(Days) Average Duration(Days) Complaints Resolved(%)
1 CHITTOOR RURALS 1 13.81 13.81 13.81 100.00
2 CHITTOOR TOWN 1 10.99 10.99 10.99 100.00
3 PILERU 1 11.17 11.17 11.17 100.00
4 PUTTUR 1 12.04 12.04 12.04 100.00
5 TIRUPATI RURALS 2 8.99 11.09 10.04 100.00
Total 6 8.99 13.81 11.35 100.00