Rectification of Voltage fluctuations in APSPDCL where upgradation of distribution system was required Jan-2021 To Mar-2021
# Sub-Division Number of Complaints Min Duration(Days) Max Duration(Days) Average Duration(Days) Complaints Resolved(%)
1 KOTA 1 8.0 8.0 8.0 100.00
Total 1 8.0 8.0 8.0 100.00