Rectification of Voltage fluctuations in APSPDCL where upgradation of distribution system was required July-2021 To September-2021
# Sub-Division Number of Complaints Min Duration(Days) Max Duration(Days) Average Duration(Days) Complaints Resolved(%)
1 KODUR 1 8.29 8.29 8.29 100.00
Total 2 8.7 18.33 13.51 100.00