Rectification of Voltage fluctuations in APSPDCL where upgradation of distribution system was required July-2021 To September-2021
# Sub-Division Number of Complaints Min Duration(Days) Max Duration(Days) Average Duration(Days) Complaints Resolved(%)
1 KADAPA OCC1 1 8.7 8.7 8.7 100.00
2 KADAPA OPERATION 1 1 18.33 18.33 18.33 100.00
Total 2 8.7 18.33 13.51 100.00