Release of New Services / Additional Loads where network expansion required in APSPDCL - 11kV Apr-2020 To Sep-2020
# Division Number of Services Released 11kv Min Duration(Days)11kv Max Duration(Days)11kv Average Duration(Days)11kv Services Released(%)11kv
1 CHITTOOR RURALS 1 44.54 44.54 44.54 100.00
2 CHITTOOR TOWN 2 142.0 172.96 157.48 0.00
3 MADANAPALE 4 17.71 200.0 104.17 50.00
4 PILERU 8 6.67 96.96 49.6 37.50
5 PUTTUR 4 25.58 248.0 97.0 50.00
6 TIRUPATI RURALS 11 40.54 181.0 86.36 9.09
7 TIRUPATI TOWN 21 21.92 185.0 49.81 71.43
Total 51 6.67 248.0 69.75 47.06