Release of New Services / Additional Loads from Existing Network in APSPDCL October-2021 To December-2021
# Section Number of Services Released EN Min Duration(Days)EN Max Duration(Days)EN Average Duration(Days)EN Services Released(%) EN
1 CTM 101 0.22 40.8 3.15 99.01
2 KURABALAKOTA 128 0.34 3.8 2.21 100.00
3 NIMMANAPALLE 50 0.22 33.66 2.86 98.00
4 PEDDAMANDYAM 95 0.22 8.67 2.66 100.00
Total 707 0.2 36.66 3.16 98.59