Rectification of Overhead Line/Cable breakdown in APSPDCL July-2021 To September-2021
# Division Number of URBAN Complaint Number of RURAL Complaints Min Duration (Hrs) URBAN Min Duration (Hrs) RURAL Max Duration (Hrs) URBAN Max Duration (Hrs) RURAL Avg Duration (Hrs) URBAN Avg Duration (Hrs) RURAL Complaints Resolved(%) URBAN Complaints Resolved(%) RURAL
1 ATMAKURU 1 1 74.67 3.98 74.67 3.98 74.67 3.98 0.00 100.00
2 GUDUR 1 5 1.98 0.4 1.98 41.1 1.98 24.0 100.00 60.00
3 KAVALI 3 12 4.74 2.02 4.8 92.35 4.77 34.64 100.00 50.00
4 NAIDUPETA 7 2 0.52 15.32 8.1 45.6 4.52 30.46 71.43 50.00
5 NELLORE RURALS 0 11 0.0 4.63 0.0 50.6 0.0 16.69 0.00 81.82
6 NELLORE TOWN 31 3 0.23 0.55 144.12 10.63 7.98 4.83 93.55 100.00
Total 43 34 0.23 0.4 144.12 92.35 8.6 23.49 88.37 67.65