# Section Number of Applications LT Min Duration(Days)LT Max Duration(Days)LT Average Duration(Days)LT Applications Processed(%) LT
1 BANGARUPALYAM 5 3.45 11.0 6.84 60.00
2 BANGARUPALYAM RURAL 1 9.0 9.0 9.0 0.00
3 YADAMARY 4 8.0 13.0 9.5 0.00
Total 10 3.45 13.0 8.12 30.00