Processing of application for New Services / Additional Loads from Existing Network in APSPDCL October-2021 To December-2021
# Section Number of Applications EN Min Duration(Days)EN Max Duration(Days)EN Average Duration(Days)EN Applications Processed(%) EN
1 B KOTHAKOTA 101 0.0 0.0 0.0 100.00
2 MULAKALACHERUVU 110 0.0 0.0 0.0 100.00
3 PEDDATHIPPASAMUDRAM 102 0.0 0.0 0.0 100.00
4 THAMBALLAPALLE 59 0.0 0.0 0.0 100.00
Total 686 0.0 0.0 0.0 100.00