Processing of application for New Services / Additional Loads from Existing Network in APSPDCL April-2022 To June-2022
# Section Number of Applications EN Min Duration(Days)EN Max Duration(Days)EN Average Duration(Days)EN Applications Processed(%) EN
1 SIMHADRIPURAM 65 0.0 0.0 0.0 100.00
2 THONDURU 19 0.0 0.0 0.0 100.00
Total 84 0.0 0.0 0.0 100.00